Pavilion Project Plan

Here is the plan for the project. I will keep this up to date with the latest progress and changes.

Site Preparation
  • Remove small trees that could threaten the pavilion (Chuck)
  • Drop the HUGE pine tree that threatens the pavilion (Teddy to get a price to drop the tree in a safe direction)
  • Test hole probes (Chuck) - Need to find 9 hole locations, 3 ft deep
Pricing Estimates
  • Pine tree removal (Teddy)
  • 6 - 26ft 2x12 Engineered Beams (Teddy)
  • Other treated wood (Teddy)
  • Ondura roofing (Teddy)
Materials
  • 6 - 26ft 2x12 Engineered Beams 
  • Other treated wood
  • See Detailed Materials List
Memorial Plaque
  • Hand Crafted Wood Memorial Plaque - (Rich and Dori)
  • "The Cy Johnson Memorial Shooting Pavilion"
  • "In memory of Cy Johnson, 1916 - 1998"
Construction
  • Hole digging and post installation
  • Main support installation
  • Roof rafter installation
  • Roof sheeting and corrugated sheeting
  • Rain guard roof framing
  • Rain guard roof surfacing
  • Shooting Bench installation
  • Spectator Bench installation 
  • Picnic Tables build
  • Memorial Plaque Installation
Ribbon Cutting Ceremony
  • Sunday, Aug 4, 2013
  • Mom Johnson to cut the ribbon